GR Silver Mining Reports Underground and Surface Drilling Results in the Plomosas Mine Area

Canada NewsWire

    • 8.6 m @ 6.50g/t Au, 79 g/t Ag, 0.7 % Pb, 5.8 % Zn (928 g/t AgEq1)
    • 5.4 m @ 9.06 g/t Au, 76 g/t Ag, 1.5 % Pb, 4.6 % Zn (1,181 g/t AgEq)
    • 0.7 m @ 19.95 g/t Au, 227 g/t Ag, 1.3 % Pb, 4.7 % Zn and 1.0 % Cu (2,507 g/t AgEq)
    • 61.1 m @ 0.4 g/t Au, 30 g/t Ag, 0.9 % Pb, 1.1 % Zn and 0.2 % Cu (144 g/t AgEq)

    VANCOUVER, BCFeb. 8, 2021 /CNW/ – GR Silver Mining Ltd. (TSXV: GRSL) (FRANKFURT: GPE) (OTCQB: GRSLF) (“GR Silver Mining” or the “Company”) – is pleased to report drill results from the underground and surface drilling program in the Plomosas Mine Area, as well as sampling results from historic drilling, at its 100%-owned Plomosas Silver Project (“Plomosas Project”) in Sinaloa, Mexico.

    The underground drilling program is targeting high-grade Ag-Au epithermal mineralization and bulk tonnage-style polymetallic mineralization in the Plomosas Mine Area, with the objective to delineate high margin precious and base metals mineralization for planned resource estimation.

    The results of the current drilling program, combined with systematic sampling of historic un-sampled drill core, at the Plomosas Mine Area, continue to delineate extensions of the mineralization previously drilled at level 775 (see News Release dated 5 January, 2021). They have also defined new mineralized zones laterally to previously mined areas with the presence of Au-rich epithermal veins. The drill results demonstrate continued success in the delineation of thick intercepts of Au-Ag-Pb-Zn-Cu mineralization, hosted in a series of hydrothermal breccias showing a strong relationship with structures and intrusions at shallow depth. These relationships indicate a potential association with a much larger epithermal system (Figure 1).

    GR Silver Mining President and CEO, Marcio Fonseca, commented, We have always had a strong belief in the large-scale potential of the Plomosas Project. We continue to outline new mineralized zones in the Plomosas Mine Area, with a series of compelling field and drill results indicating a much larger epithermal system. More recent geochemical and geophysical data, and vectors, suggest the mineralization within the Plomosas Project to be a district-scale system. Surface and underground drilling is continuing, in combination with surface exploration, in the vicinity of both the Plomosas Mine and San Juan Areas as part of our business strategy to delineate additional zones of epithermal veining and hydrothermal breccias.”

    AgEq is based on long term gold, silver, zinc, lead and copper prices of US$1600 per ounce gold, US$16.50 per ounce silver, US$0.85 per pound zinc, US$0.95 per pound lead and US$3.00 per pound copper. The metallurgical recoveries are assumed as 90% Ag, 95% Au, 78% Pb, 70% Zn and 70% Cu.

    The surface and underground diamond drilling program, together with sampling of existing historic core, is designed to delineate new mineralized zones and enhance 3D geological modelling at adequate spacing to support the upcoming resource estimation. The program has been successful in discovering and confirming the continuity of epithermal mineralization throughout the Plomosas Mine Area, in zones previously unexplored.

    The drilling results (Table 1) demonstrate the upside potential of the Plomosas Mine Area and show results which are expected to add to the upcoming resource estimation. Table 1 and 2 summarize the most significant assay results for the drill holes reported in this News Release.

    Table 1: Underground and Surface Drill Hole Assay Results – News Release February 8, 2021 (Plomosas Mine Area)

    Hole No.

    Type

    From
    (m)

    To
    (m)

    Drilled
    width
    (m)

    Ag g/t

    Au g/t

    Pb %

    Zn %

    Cu %

    AgEq
    g/t

    PLI20-05

    UG

    76.0

    80.0

    4.0

    39

    2.63

    0.2

    0.1

    0.2

    includes

    77.0

    78.0

    1.0

    136

    8.95

    0.6

    0.1

    0.4

    1,101

    includes

    108.9

    118.0

    9.2

    25

    2.77

    0.2

    0.6

    0.2

    108.9

    109.5

    0.6

    227

    19.95

    1.3

    4.7

    1.0

    2,507

    PLI20-06

    UG

    0.0

    8.0

    8.0

    5

    0.01

    0.3

    1.0

    0.1

    PLI17-32

    UG

    63.9

    74.5

    10.6

    68

    1. 37

    0.4

    0.6

    0.1

    245

    As final interpretation of the 3D orientation of mineralization is incomplete, true widths are unknown at this time and are reported as drilled widths. AgEq is based on long term gold, silver, zinc and lead prices of US$1600 per ounce gold, US$16.50 per ounce silver, US$0.85 per pound zinc, US$0.95 per pound lead and US$2.00 per pound copper. The metallurgical recoveries are assumed as 90% Ag, 95% Au, 78% Pb, 70% Zn.and 70% Cu. “na” = no relevant assays. All numbers are rounded. Results are uncut and undiluted. UG: Underground Drill Hole, SURF: Surface Drill Hole

    Table 2: Historic Surface and Underground Drill Hole Assay Results – News Release February 8, 2021 (Plomosas Mine Area)

    Hole No.

    Type

    From
    (m)

    To
    (m)

    Drilled
    width
    (m)

    Ag g/t

    Au g/t

    Pb %

    Zn %

    Cu %

    AgEq
    g/t

    28

    UG

    35.2

    36.9

    1.7

    12

    1.7

    1.5

    4.5

    *

    72

    UG

    0.0

    6.1

    6.1

    127

    0.01

    1.3

    0.9

    *

    198

    UG

    11.8

    14.8

    3.0

    288

    0.01

    0.2

    0.4

    *

    307

    75

    UG

    0.0

    12.0

    12.0

    105

    0.01

    1.1

    0.9

    *

    169

    113

    UG

    49.4

    58.0

    8.6

    79

    6.50

    0.7

    5.8

    *

    928

    128

    UG

    43.0

    50.8

    7.8

    24

    1.33

    0.8

    3.8

    *

    128

    UG

    50.8

    56.2

    5.4

    76

    9.06

    1.5

    4.6

    *

    1,181

    130

    UG

    31.0

    32.0

    1.0

    20

    6.00

    0.6

    2.6

    *

    UG

    34.5

    37.0

    2.5

    28

    1.24

    1.1

    1.8

    *

    135

    UG

    59.5

    61.8

    2.3

    30

    0.2

    15.7

    4.1

    *

    138

    UG

    46.5

    49.7

    3.2

    15

    0.03

    6.4

    3.9

    *

    140

    UG

    4.8

    5.8

    1.0

    25

    0.03

    5.1

    1.2

    *

    200

    UG

    0.0

    17.7

    17.7

    19

    0.05

    2.2

    2.4

    *

    UG

    23.7

    24.1

    0.4

    130

    0.02

    10.0

    14.1

    *

    862

    UG

    28.8

    29.8

    1.0

    110

    0.07

    0.6

    2.8

    *

    215

    202

    UG

    0.0

    5.5

    5.5

    34

    0.08

    3.0

    1.9

    *

    SD-19

    SURF

    209.0

    215.0

    6.0

    10

    0.2

    2.2

    0.6

    0.2

    SURF

    231.0

    241.0

    10.0

    37

    0.2

    1.1

    0.6

    0.2

    SD-24

    SURF

    213.6

    225.5

    11.9

    10

    0.4

    0.2

    0.6

    *

    SD-32

    SURF

    212.1

    273.2

    61.1

    29

    0.4

    0.9

    1.1

    0.2

    144

    SD-44

    SURF

    281.2

    281.8

    0.6

    330

    0.2

    8.6

    9.1

    5.4

    1,244

    SURF

    293.9

    305.2

    11.3

    16

    0.4

    3.0

    3.2

    *

    SD-9

    SURF

    252.9

    261.3

    8.4

    17

    3.2

    2.4

    1.1

    *

    457

    As final interpretation of the 3D orientation of mineralization is incomplete, true widths are unknown at this time and are reported as drilled widths. AgEq is based on long term gold, silver, zinc and lead prices of US$1600 per ounce gold, US$16.50 per ounce silver, US$0.85 per pound zinc, US$0.95 per pound lead and US$2.00 per pound copper. The metallurgical recoveries are assumed as 90% Ag, 95% Au, 78% Pb, 70% Zn.and 70% Cu. “*” = no copper assays. All numbers are rounded. Results are uncut and undiluted. UG: Underground Drill Hole, SURF: Surface Drill Hole

    The following table (Table 3) summarizes the collar locations for drill holes reported in this News Release.

    Table 3: Drill Hole Locations – News Release February 8, 2021 (Plomosas Mine Area)

    Hole No.

    East (m)

    North (m)

    RL (m)

    Dip

    Azimuth

    Depth (m)

     PLI20-05

    451136

    2551933

    748

    -30

    300

    188

     PLI20-06

    451136

    2551933

    748

    -15

    315

    128

     PLI17-32

    451035

    2551807

    750

    -40

    65

    124

    28

    451446

    2551858

    927

    -90

    0

    53

    72

    451437

    2551841

    929

    55

    270

    37

    75

    451437

    2551841

    929

    30

    270

    46

    113

    451044

    2551898

    751

    -90

    0

    122

    128

    451061

    2551906

    751

    -90

    0

    100

    130

    451044

    2551898

    759

    -55

    80

    85

    135

    451420

    2551881

    927

    -80

    90

    88

    138

    451421

    2551881

    927

    -55

    90

    69

    140

    451422

    2551881

    927

    -35

    90

    65

    200

    451239

    2551978

    810

    0

    270

    34

    202

    451247

    2551978

    810

    0

    90

    43

    SD-19

    451049

    2551838

    990

    -75

    90

    263

    SD-24

    451049

    2551838

    990

    -90

    0

    275

    SD-32

    451049

    2551838

    990

    -80

    90

    328

    SD-44

    451105

    2551858

    1,024

    -90

    0

    312

    SD-9

    451075

    2551782

    999

    -75

    360

    292

    All numbers are rounded. Red drill holes are drilled by GRSL

    The drill hole PLI20-05 represents a 60 m step-out along strike from the previously released high-grade Au-Cu mineralization discovered at the deepest level (775m RL) of the Plomosas Mine Area (see News Release dated 5 January, 2021). The latest step-out drill hole intersected a high-angle faulted zone hosting similar high-grade Au-Cu mineralization, however more constrained by the fault (see Core Samples PLI20-05). Additional drilling is in progress to further delineate the limits of this mineralization.

    The drill hole SD-09 represents unmined zones, with underground development/access completed in the past. The polymetallic breccia at this level of the historical workings, reports high Au content together with Pb-Zn mineralization hosted in sulfide rich (Pb-Zn) banded crustiform quartz veinlets.

    The drill hole SD-32 represents the eastern limit of the mineralization defined in level 775, and is located between two historical underground developments. It confirmed the presence of a broad, bulk mineable style of mineralization, with widespread concentration of disseminated sulfides throughout the whole 61 m mineralized interval.

    The drill holes, 28-72-75-113-128-130-135-138-140-200-202 and PLI17-32 represent historical underground holes drilled in various levels of the Plomosas Mine Area with positive intersection of Ag-Au-Pb-Zn rich Plomosas hydrothermal breccia.

    Management believes that the large epithermal system at the Plomosas Mine Area is hosted by regional high and low angle structures cross-cutting a suite of acid/basic volcanic units, widely altered to clay minerals visible at surface in some areas (Figure 2). This type of alteration is typical of the upper part of large epithermal systems and could represent additional zones of underlying epithermal quartz veining, similar to veins currently exposed in the historic underground workings. The potential extent of mineralization of these exploration targets is still conceptual in nature, however, provides additional evidence of the large and rich footprint of precious and base metal mineralization in the Plomosas Project.

    GR Silver Mining believes that the Plomosas Mine Area is part of a much larger epithermal system supported by field evidence along a 1.2 km strike length. The 2021 underground and surface exploration program aim to delineate maiden resource estimates in two areas, Plomosas Mine and San Juan, as well as discovering new mineralized zones close to the surface in the remaining part of the exploration concessions.

    Qualified Person

    The scientific and technical data contained in this News Release related to the Plomosas Project was reviewed and/or prepared under the supervision of Marcio Fonseca, P.Geo. He has approved the disclosure herein.

    Quality Assurance Program and Quality Control Procedures (“QA/QC”)

    The Company has implemented QA/QC procedures which include insertion of blank, duplicate and standard samples in all sample lots sent to SGS de México, S.A. de C.V laboratory facilities in Durango, Mexico, for sample preparation and assaying. For every sample with results above Ag >100 ppm (over limits), these samples are submitted directly by SGS de Mexico to SGS Canada Inc at Burnaby, BC. The analytical methods are 4-acid Digest and Inductively Coupled Plasma Optical Emission Spectrometry with Lead Fusion Fire Assay with gravimetric finish for silver above over limits. For gold assays the analytical methods are Lead Fusion and Atomic Absorption Spectrometry Lead Fusion Fire Assay and gravimetric finish for gold above over limits.

    The recent drill holes, completed by First Majestic from 2016 to 2018, followed QA/QC protocols reviewed and validated by GR Silver Mining, including insertion of blank and standard samples in all sample lots sent to First Majestic’s Laboratorio Central facilities in La Parilla, Durango, for sample preparation and assaying. Additional validation and check assays were performed by an independent laboratory at SGS de México, S.A. de C.V. facilities in Durango, Mexico. The analytical methods applied for these recent holes for Ag and Au assays comprised of Fire Assay with Atomic Absorption finish for samples above Au >10ppm and Ag >300ppm and Gravimetric Finish. Lead and Zn were analyzed using Inductively Coupled Plasma Optical Emission Spectrometry. GR Silver Mining has not received information related to the Grupo Mexico QA/QC and assay protocols and at this stage is considering the information historic for news release purposes.

    The Company also announces it has received TSX-V approval to the shares for debt transactions previously announced on January 21, 2021 and consequently has issued 141,097 common shares to settle an aggregate debt of $104,412. All shares issued in conjunction with the debt settlements are subject to a hold period expiring June 6, 2021 in accordance with applicable securities laws and the policies of the TSX-V.

    About GR Silver Mining Ltd.

    GR Silver Mining Ltd. is a Mexico-focused company engaged in cost-effective silver-gold resource expansion on its key assets which lie on the eastern edge of the Rosario Mining District, Sinaloa, Mexico.

    PLOMOSAS SILVER PROJECT

    GR Silver Mining owns 100% of the Plomosas Silver Project located near the historic mining village of La Rastra, within the Rosario Mining District. The Project is a past-producing asset where only one mine, the Plomosas silver-gold-lead-zinc underground mine, operated a 600 tpd crush milling flotation circuit from 1986 to 2001, producing approximately 8 million ounces of silver, 73 million pounds of lead and 28 million pounds of zinc.

    The Project has an 8,515-hectare property position and is strategically located within 5 km of the Company’s San Marcial Silver Project in the southeast of Sinaloa State, Mexico.

    The March 2020 acquisition of the Plomosas Silver Project included 563 historical and recent drill holes from both surface and underground locations. These drill holes represent an extensive database allowing the Company to advance towards resource estimation and potential project development in the near future.

    The Company has commenced an 11,900 m drilling program with surface holes focused on expanding known mineralization along strike in two initial areas, the Plomosas Mine Area and the San Juan Area. Underground drilling included in the program will target the extension of recent polymetallic discoveries at the lowest level (775 m RL, or ~250 m below surface) of the Plomosas Mine Area and six low sulfidation epithermal veins at San Juan Area. Both areas will be the subject of NI 43-101 resource estimations following completion of this drill program.

    The 100%-owned assets include all facilities and infrastructure including: access roads, surface rights agreement, water use permit, 8,000 m of underground workings, water access, 60 km – 33 KV power line, offices, shops, 120-person camp, infirmary, warehouses and assay lab representing approximately US$30 million of previous capital investments. The previous owners invested approximately US$18 million in exploration, including extensive geophysics and geochemistry programs.

    The silver and gold mineralization on this Project display the alteration, textures, mineralogy and deposit geometry characteristics of a low sulfidation epithermal silver-gold-base metal vein/breccia mineralized system. Previous exploration was focused on Pb-Zn-Ag-Au polymetallic shallow mineralization, hosted in NW-SE structures in the vicinity of the Plomosas mine. The E-W portion of the mineralization and extensions for the main N-S Plomosas fault remain under-explored.

    In addition to the resource potential at Plomosas, a review of the existing drill hole database, geophysical surveys and geochemical data covering most of the concession, has defined 16 new exploration targets from which 11 have high priority for future exploration programs.

    SAN MARCIAL PROJECT

    San Marcial is a near-surface, high-grade silver-lead-zinc open pit-amenable project, which contains a 36 Moz AgEq (Indicated) and 11 Moz AgEq (Inferred) NI 43-101 resource estimate. The Company has filed a National Instrument 43-101 (“NI 43-101”) report entitled “San Marcial Project Resource Estimation and Technocal Report, Sinaloa, Mexico” having a effective date of March 18, 2019 and an amended date of June 10, 2020 (the “Report”). The Report was prepared by Todd McCracken and Marcelo Filipov of WSP Canada Inc. and is available on SEDAR. The company recently completed over 320 m of underground development in the San Marcial Resource Area, from which underground drilling is planned to expand the high-grade portions of the resource down dip. The Company recently discovered additional mineralization in the footwall, outside of the existing resource, and will also be drilling this area. GR Silver Mining is the first company to conduct exploration at San Marcial in over 10 years. The NI 43-101 resource estimate (San Marcial Project – Resource Estimation and Technical Report) was completed by WSP Canada Inc. on March 18, 2019 and amended on June 10, 2020.

    Recent exploration has identified silver and gold mineralization in areas previously defined as non-mineralized, discovering evidence of pervasively altered rocks with intense silicification, veining and associated wide, silver and gold mineralized zones on the footwall of the NI 43-101 resource.

    Plomosas and San Marcial collectively represent a geological setting resembling the multimillion-ounce San Dimas Mining District which has historically produced more than 600 Moz silver and 11 Moz gold over a period of more than 100 years.

    OTHER PROJECTS

    GR Silver Mining’s other projects are situated in areas attractive for future discoveries and development in the same vicinity of Plomosas and San Marcial in the Rosario Mining District.

    Mr. Marcio Fonseca
    P. Geo, President & CEO
    GR Silver Mining Ltd.

    Facebook LinkedIn Twitter

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this press release.

    Disclaimer for Forward-Looking Information

    This press release contains forward-looking statements and information that are based on the beliefs of management and reflect the Company’s current expectations. When used in this press release, the words “estimate”, “project”, “belief”, “anticipate”, “intend”, “expect”, “plan”, “predict”, “may” or “should” and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. Such statements and information reflect the current view of the Company. Risks and uncertainties may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements.

GR Silver Mining Ltd. (CNW Group/GR Silver Mining Ltd.)

SOURCE GR Silver Mining Ltd.CisionView original content to download multimedia:http://www.newswire.ca/en/releases/archive/February2021/08/c1772.html